ANR DIBIM Project
Collaborative (BIM) approach for the asset management of Dykes interconnected with urban infrastructures and vegetation: focus on technical and economic issues
Context
Urban infrastructure, including defence works, forms complex and interconnected networks essential for the maintenance of a society’s vital functions. In a context of reduced budgets for local authorities, and evolving governance (MAPTAM laws and NOTRe, GEMAPI competence). Faced with this situation, infrastructure asset management (IAM) aims to effectively maintain, operate and renew infrastructures in the short and long term. Each infrastructure is currently managed independently with little consideration for physical or functional interactions; data are stored and managed in isolated and often incompatible ways.
At the same time, the evolutions associated with the digital transition in the field of construction promote data structuring and exchange as well as a modification of organizations to make information flows more efficient using an approach collaborative.
Based on these two considerations, the DIBIM project aims to propose a collaborative approach for the management of urban systems - here composed of dykes interconnected with urban infrastructure and vegetation - with regard to technical and economic issues.
Abstract
The proposed approach consists of formalizing the technical and economic indicators for monitoring and diagnosing dykes according to a systemic approach (WP1); to propose an efficient collaborative exchange process by collecting the needs of managers and analyzing current processes (WP2) and to structure the data, resulting from WP1&2, for their graphic modeling, their centralization and their sharing in order to plan and manage maintenance work costs (WP3). The collaborative approach, the purpose of this project, will also be a transversal work axis for the WPs. The project team brings together skills in technical and economic infrastructure expertise, systemic analysis, performance evaluation, governance and analysis of practices, collection of needs, cost management and structuring, modeling and data management. It relies on four local authorities and a professional association for the collection of needs and the experimentation of the proposed approach.
Figure 1: Project structuration
Figure 2: Project organisation
Scientific inquiries
In relation to the system of objects of study and formalization of expert knowledge:
How to describe the system (operation and dysfunction)?
What are the impacts of interactions?
How to determine the relevant fields of study (time and scale)?
How to define technical and economic management strategies for the relevant infrastructures?
In relation to dike and infrastructure managers:
What are the relevant scales to obtain information?
Where and what to store and share?
Obtain common data adopted by several managers?
How to make the tools interoperable?
In relation to methods and tools:
What are the technical management practices of current infrastructures?
What are the expectations and willingness to exchange data?
How to validate the developed tools?
Expected results
New knowledge on the functioning and dysfunctions of dams in interaction with urban infrastructure and vegetation
Formalization of current exchange processes between managers; impacts of management decisions
Barriers and expectations regarding the collaborative approach
Guidelines for determining the appropriate scale of management decisions considering numerical sobriety (section length of dykes, global analysis with GIS or local analysis with BIM)
Guidelines for best practices (including the collaborative approach and physical and economic time evolution of the system
Provision of a collaborative platform, in the form of a prototype, to format, capitalize, and share data and information.
Partners
Supports
General information
Duration: 01/01/2025 to 12/31/2028
Budget: 838 k€ - ANR support: 350 k€
Non-permanent staff recruited: 1 Doctoral student - 8 Masters 2 (48 months) - 3 Study engineer (24 months)
Contact
Scientific coordinator: Aurélie TALON - This email address is being protected from spambots. You need JavaScript enabled to view it. – 04 73 40 72 57